N57 Closure for Oosterscheldekering Maintenance on April 20, 22, 24, 29

On April 20, 22, 24, and 29, 2026, the N57 road from De Banjaard (Kamperland) to Kraaijensteinweg (Westenschouwen) will be closed between 09:00 and 15:00 for maintenance of the Oosterscheldekering. Drivers should allow an extra 30 minutes travel time. The roadwork will be lifted on these days for major maintenance of the moving works of the barrier. Traffic is diverted via the Zeelandbrug using N255, N256, N59, and other routes, with signs indicating the detour. Cyclists and mopeds can travel to the location where the movement work is lifted, then resume once lifted; no detour route is available for cyclists. Work is scheduled for the morning, but weather or progress could shift the lift later or to a reserve window. Further details are on the Oosterscheldekering: renovation moving works page.

Source: Rijkswaterstaat

source

Made by AI. If you spot anything of concern write us at contact@cybach.com. We’ll promptly correct irregularities.


Posted